309 Regent Street, University of Westminster

Jerram Falkus are undertaking refurbishment works on this Grade II Listed Building in the heart of the Capital. The site is the flagship building for the University of Westminster.

As an experienced education construction company, Jerram Falkus understands the sensitivities of working within live academic environments. Given the historic nature of the building and the prominent location, Jerram Falkus have been working closely with the Planning Officer at Westminster City Council.

Located along one of the busiest thoroughfares in Westminster, works include:

  • To Repair, Replace or Upgrade 40 individual roofs following surveys.
  • Replacement or repair of identified roofs
  • Removal of redundant plant.
  • Relocation or replacement of rooftop plant as identified in survey reports
  • Upgrade and improvements to roof access and safety arrangements incorporating maintenance and cleaning access requirements.
  • Installation of PV units to East side roofs.
  • Refurbishment and repairs to external wall surfaces.
  • Replacement, refurbishment, repairs to windows and skylights.
  • Improvements to rainwater and roof drainage systems.
  • Repairs to the historical ‘Readograph’

This has been a highly complex project and over the coming months we will be undertaking essential additional structural repairs to the rear external façade.

This will involve a lot of exposing brickwork and steelwork. We also need to rip out two fire escape stairways as in their current state, and even with minor repairs, they would not comply with today’s rigorous health and safety regulations. The work to replace these staircases will allow our team to continue work safely as well as ensuring effective and compliant escape routes in the years to come.

Other Projects

David Street & Anne Street, Newham

We recently delivered two housing projects for the London Borough of Newham. The two schemes are part of Wave 1 of infill sites identified for the borough’s affordable home 2018-2022 programme. Together the two schemes see the construction of a combination of houses, flats and maisonettes. Both projects have produced low energy homes designed to […]

Read More

The Anning Rooms, Natural History Museum, South Kensington

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and […]

Read More

Ark Soane, Acton

This mixed-use project has seen the creation of a combined education and residential development in Acton, one of our largest construction projects in recent years. Educational Development LocatED Property Ltd, an arms-length body to the Department for Education, acted for the landowner and the Secretary of State for Education. Their role is to secure sites […]

Read More

The Foundry, Islington

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with […]

Read More

Ranelagh Primary School, Stratford

Our building firm in London completed a new build two-storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much-needed new entrance and additional space for a nursery and staff resource areas, plus a […]

Read More

Kingston House and Oman Avenue, Brent

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More

Gloucester Avenue & Frontenac

As a trusted residential construction company, Jerram Falkus was appointed under a design and build contract to deliver two new residential sites: Gloucester Close and Frontenac on Donnington Road. The two developments will provide a mixture of flats and houses in line with the borough’s current housing commitments: Gloucester Close – 2 x two-bed houses […]

Read More

University for Creative Arts, Farnham Campus, Surrey

Jerram Falkus is thrilled to announce the successful completion of a cutting-edge Film and Media Education Centre at the University for Creative Arts (UCA) in Farnham, Surrey. This project underscores our expertise in crafting specialised educational environments that nurture creativity and innovation.  Project Insight  The new Film and Media Education Centre is a testament to […]

Read More

Baldwin Terrace, Islington

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in […]

Read More

Seven Islands Leisure Centre, Rotherhithe

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The leisure centre building refurbishment provides a new reception area […]

Read More

Low Energy and Passivhaus Construction Brochure

OUR EXPERTISE Jerram Falkus Construction’s low energy and Passivhaus experience has broadened over the years and we are seeing an ever increasing demand from our clients for properties to be designed and constructed with zero carbon targets in mind. FIND OUR MORE –  Low energy and passivhaus construction brochure Find out more about our experience […]

Read More

Weighbridge, Dagenham

Our first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of the enabling works […]

Read More