Jerram Falkus are undertaking refurbishment works on this Grade II Listed Building in the heart of the Capital. The site is the flagship building for the University of Westminster.

Given the historic nature of the building and the prominent location, Jerram Falkus have been working closely with the Planning Officer at Westminster City Council.

Located along one of the busiest thoroughfares in Westminster, works include:

  • To Repair, Replace or Upgrade 40 individual roofs following surveys.
  • Replacement or repair of identified roofs
  • Removal of redundant plant.
  • Relocation or replacement of rooftop plant as identified in survey reports
  • Upgrade and improvements to roof access and safety arrangements incorporating maintenance and cleaning access requirements.
  • Installation of PV units to East side roofs.
  • Refurbishment and repairs to external wall surfaces.
  • Replacement, refurbishment, repairs to windows and skylights.
  • Improvements to rainwater and roof drainage systems.
  • Repairs to the historical ‘Readograph’

Other Projects

Ark Soane, Acton

Construction works are currently underway at Ark Soane, a £52m design and build scheme for Countryside and the Department for Education. This mixed-use project will see the creation of a combined education and residential development in Acton, one of our largest construction projects in recent years. Educational Development LocatED Property Ltd, an arms-length body to […]

Read More

Park Primary School, Stratford

Our construction firm worked on the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a […]

Read More

The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership. All foundations were piled due to poor quality of […]

Read More

The Anning Rooms, Natural History Museum, South Kensington

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and […]

Read More

285-289, Golders Green Road

Jerram Falkus recently started on site at our Golders Green Road scheme. The project consists of the construction of a six-storey block of 22 flats including basement car park. Enabling Works: This element of the works incorporated the construction of a crossover on Golders Green Road, the removal of live services, felling of trees and […]

Read More

Great Ormond Street Hospital, Bloomsbury

Jerram Falkus completed the refurbishment and conversion of a pair of adjoining Grade II listed Georgian townhouses for Great Ormond Street Hospital Charity at Powis Place, London. The works included a new build single-storey rear extension at ground level, refurbishment throughout and redecoration works to the external envelope. The conversion saw a change of use […]

Read More

Ranelagh Primary School, Stratford

Our building firms London-based construction team completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much-needed new entrance and additional space for a nursery and staff resource areas, […]

Read More

Revolutionising Respite Care: The Haydock Avenue, Northolt Project

Jerram Falkus is proud to unveil the completion of a pioneering public sector healthcare project for the Ealing Council community. Our latest endeavour at Haydock Avenue, Northolt, is a specially designed respite care facility meticulously crafted to cater to the needs of young children and young adults with disabilities.  Project Insight  Embarking on this project, […]

Read More

Wivenhoe Road, Dagenham

Our company worked on our second modular housing construction project for Barking and Dagenham and will provide 20 new two-bedroom containerised homes. We prepared the groundwork ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping took place and we completed the project […]

Read More

Kingsbridge Terraces, Barking

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre. All of […]

Read More

David Street & Anne Street, Newham

We recently delivered two housing projects for the London Borough of Newham. The two schemes are part of Wave 1 of infill sites identified for the borough’s affordable home 2018-2022 programme. Together the two schemes see the construction of a combination of houses, flats and maisonettes. Both projects have produced low energy homes designed to […]

Read More

Weighbridge, Dagenham

Our first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of the enabling works […]

Read More