Ark Soane, Acton

Construction works are currently underway at Ark Soane, a £52m design and build scheme for Countryside and the Department for Education. This mixed-use project will see the creation of a combined education and residential development in Acton, one of our largest construction projects in recent years.

Educational Development

LocatED Property Ltd, an arms-length body to the Department for Education, acted for the landowner and the Secretary of State for Education. Their role is to secure sites and buildings for new schools in order to deliver much-needed school places. This project is part of that effort to address the shortage of school places in the area.

The construction of two x 7-storey tower blocks and one x 12-storey tower block, reaching 70m tall, including a basement level, is taking place on the site. The ground, first and second floors will accommodate phase 2 of Ark Soane Academy, a new 1,200-place secondary school. The academy will provide a state-of-the-art learning environment for students, with modern amenities and classrooms designed to encourage collaborative learning.

Residential Development

In addition to the academy, the upper levels of the towers will have 113 residential properties, with three separate townhouses also being built on the site. A large proportion of the new homes are being constructed for the Greater London joint venture between Sigma Capital Group plc, the build-to-rent specialist, and its partner EQT Exeter who are part of a global investment firm. These homes will be for the private rental market.

Once built, these 92 private rental apartments will be let and managed by Sigma Capital Group plc, under the ‘Simple Life London’ rental brand. Of the remaining homes in the new development, 21 will be affordable dwellings, managed by Network Homes, and three will be for open market sale by Countryside.

Location and Amenities

The new housing units will be conveniently situated near The Woodlands Park and Acton High Street, providing easy access to reliable transportation. The area offers an array of amenities, including shops, eateries, and entertainment options, all within close proximity to the development.

Sustainability

A sustainable energy centre utilising a Ground Source Heat Pump is also being delivered as part of the development. This will provide a renewable and low-carbon energy source for the academy and residential properties, helping to reduce their carbon footprint.

Completion Dates

Practical completion of Ark Soane Academy for the Department of Education/LocatED is expected to be achieved by Summer 2023. The residential dwellings for Countryside are due to reach completion by Autumn 2023.

We are very proud to be delivering this major mixed-use project, which will provide much-needed school places and high-quality homes for the Acton area. We look forward to seeing the project reach completion and being able to hand over a scheme that will benefit the local community for many years to come.

About Jerram Falkus

This project is an example of our commitment to delivering large-scale projects that are of social and economic benefit to local communities and the wider region. Jerram Falkus has a track record of delivering high-quality education and residential development projects, and our team of professionals is committed to providing the same level of service to this project.

Our expertise ranges from designing and building residential properties to constructing educational facilities. If you’re looking for an established construction company to help with your construction projects, get in touch with us today.

Other Projects

Latymer Upper School Sports Facility, Hammersmith

Our local building contractors worked on the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming […]

Read More

St Benedict’s School, New Ark, Ealing

Jerram Falkus takes immense pride in announcing the successful completion of the New Ark project at St Benedict’s School in Ealing. Following the triumph of prior construction endeavours for the school’s Sixth Form and Art Design & Technology Building, our appointment reaffirms our expertise in creating educational environments that inspire learning and growth.  Project Vision   […]

Read More

Arnold Road, Bow – A Beacon of Affordable Housing in East London

Nestled in the vibrant heart of Bow, East London, Jerram Falkus is making tangible strides in residential development with our Arnold Road project, an ambitious £24.5 million undertaking for the London Borough of Tower Hamlets. This development is a construction endeavour and a community-centric initiative to bolster affordable housing options in the bustling metropolis.  Project […]

Read More

The Learning Hub at St Christopher’s Hospice, Sydenham

St Christopher’s Hospice provides skilled and compassionate end-of-life care and bereavement support of the highest quality, combining specialist care, research and education. Jerram Falkus was appointed to work on the construction of this educational project for the healthcare industry. The Learning Hub project for the Hospice which will provide; A flexible lecture space for up […]

Read More

Baldwin Terrace, Islington

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in […]

Read More

Wivenhoe Road, Dagenham

Our company worked on our second modular housing construction project for Barking and Dagenham and will provide 20 new two-bedroom containerised homes. We prepared the groundwork ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping took place and we completed the project […]

Read More

Tollgate Primary School, Plaistow

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two-form to three-form entry to provide capacity for over 630 children. Our London-based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two […]

Read More

Haberdashers’ Aske’s Boys’ School, Elstree, Hertfordshire

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More

92 Leyton Green Road, Leyton

We are proud to have delivered the 92 Leyton Green residential scheme, which is a project that provides 47 new homes to residents of the London Borough of Waltham Forest. The residential construction project involves the construction of two buildings that open onto a beautifully landscaped courtyard, providing residents with a safe and peaceful environment […]

Read More

Revolutionising Respite Care: The Haydock Avenue, Northolt Project

Jerram Falkus is proud to unveil the completion of a pioneering public sector healthcare project for the Ealing Council community. Our latest endeavour at Haydock Avenue, Northolt, is a specially designed respite care facility meticulously crafted to cater to the needs of young children and young adults with disabilities.  Project Insight  Embarking on this project, […]

Read More

Kingston House and Oman Avenue, Brent

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More

Kingsbridge Terraces, Barking

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre. All of […]

Read More