Projects

EKO Pathways/Eleanor Smith School

Eleanor Smith School (EKO pathways) is a special educational needs school based across two sites in the London Borough of Newham. This new build site provides the School with a brand-new facility constructed on a brownfield site in East Ham.

The new Eleanor Smith School site caters for children and young people with social, emotional and mental health difficulties (SEMH).

The new buildings have been constructed in cross laminated timber (CLT), and will provide generous, flexible classrooms and specialist teaching resource areas, with break-out spaces and extensive external landscaping.

Other Projects

Ranelagh Primary School

A new build two storey 600m2 extension and internal refurbishment works at an existing primary school in Newham. The new extension, designed by Rivington Street Studio Architects, provides much needed new entrance and additional space for a nursery and staff resource areas plus new studio area at 1st floor level.

Read More

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

St Christopher’s Hospice, Learning Hub

St Christopher’s Hospice provides skilled and compassionate end of life care and bereavement support of the highest quality, combining specialist care, research and education. Jerram Falkus is undertaking The Learning Hub project for the Hospice which will provide; A flexible lecture space for up to 120 people, which can divide into three smaller teaching rooms […]

Read More

Geffrye Place, Hoxton

The Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of Hackney. The scheme comprised both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent. The existing public house listed building has been stabilised, retained and […]

Read More

52 Whitmore Road (mixed use CLT)

52 Whitmore Road is a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double height photographer’s studio and three duplex flats with roof terraces. The Cross Laminated Timber (CLT) structure was completed […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices.   Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete […]

Read More

The Anning Rooms, Natural History Museum

An exclusive Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, works to the towers on the 2nd and 3rd floors are being developed concurrently.   The remodelling […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More