Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures for cranage and lifting.  Logistics were further challenged by the narrow, winding Butterfly Lane being densely trafficked during school drop off and pick uptimes, and a cut-through generally, where large vehicles required the majority of the road width.

 

The project consists of the construction of a new build sports facility comprising a 25m 8-lane swimming pool, fitness suite, dance studios, administration rooms, multi- use rooms, kitchen, toilets, plant room, offices and external works and service connections. A new build steel frame constructed two/double storey building on piled foundations, pre-cast plank floors and cast-insitu waterproof concrete pool and basement plant areas.  Facades are of cavity masonry, Trespa Rainscreen cladding and glazed curtain walling with a Kalzip profiled metal roof system and external works and service connections.

Other Projects

Ranelagh Primary School

We have completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much needed new entrance and additional space for a nursery and staff resource areas, plus new studio […]

Read More

The Foundry

This project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with an air […]

Read More

East End Thames View

The redevelopment of the eastern end of the Thames View Estate in Barking provides 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works involved the construction of five apartment blocks running north to south along the […]

Read More

University for Creative Arts, Farnham

The design and construction of a new Film and Media Centre at the University for Creative Arts campus in Farnham. The new building has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare today’s creative students for industry. Construction took place […]

Read More

Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new […]

Read More

Wivenhoe Road Modular Housing

Our second modular housing project for Barking and Dagenham will provide 20 new two-bedroom containerised homes. We prepared the groundworks ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping will start and we are set to complete the project within 30 weeks […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed to expand from two form to three form entry to provide capacity for over 630 children. We constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two new classrooms, three […]

Read More

Peckham Palms, Hair and Beauty Hub

The Palms is a retail space, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to a new build purpose designed facility on the site of former disused […]

Read More

52 Whitmore Road (mixed use CLT)

52 Whitmore Road is a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double height photographer’s studio and three duplex flats with roof terraces. The Cross Laminated Timber (CLT) structure was completed […]

Read More

Baldwin Terrace

The partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus […]

Read More

Respite Care Haydock Avenue

We are delighted to have completed this specially-designed respite facility for Ealing Council.The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. Works consisted of the demolition of former garages and construction […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More