Hounslow Town Primary School, New Build Project

As a new build construction company, Hounslow Town Primary was one of our most prestigious education projects, the £20m new build school project has provided a new five-form entry primary school just off the High Street in Hounslow, within site of wider housing development.

Our reinforced concrete framed, brick clad school building is part two and part three-storey. Our new build developers comprised the construction of the new building on land adjacent to the original school. Once the new school building was complete all students and staff were decanted into the new building and the existing school building was demolished and part landscaped as school playground and sports facilities. There is SEN provision within the new build school which has been fit-out with specialist equipment as required. The external Staff Terrace is flexible and can become an outdoor area for SEN use, which has a glass balustrade to increase the height of the parapet allowing students to play safely in this area.

As the school is directly under the Heathrow flight path, it cannot be naturally ventilated due to external noise constraints. Instead, it is fully mechanically ventilated via VRF ceiling concealed fan coil units. Using IES software, a fully compliant design solution has been produced which takes into account over-shading analysis and daylight assessments in calculating the heating and cooling loads, in order that cooling is only provided where absolutely necessary.

When our building construction firm completed the School project, our client, Countryside Properties PLC then commenced works on site of the orginal school on a housing development to provide 250 mixed-tenure homes.

Looking for a new build construction company to help with a project? Look no further than Jerram Falkus. We provide experienced and high-quality work and showcase a vast portfolio of construction projects. Contact us today for more information.

Other Projects

Low Energy and Passivhaus Construction Brochure

OUR  EXPERTISE Jerram Falkus Construction’s low energy and Passivhaus experience has broadened over the years and we are seeing an ever increasing demand from our clients for properties to be designed and constructed with zero carbon targets in mind. FIND OUR MORE –  Low energy and passivhaus construction brochure Find out more about our experience […]

Read More

Park Primary School, Expansion Project

Our construction firm workedon the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof […]

Read More

92 Leyton Green Road, Residential Construction

We are delivering the 92 Leyton Green residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one bedroom, 16 two bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of the Short […]

Read More

Shetland Road, Bow

We are undertaking the £5.4m design and build contract for 19 new build low energy homes at Shetland Road, Bow in East London. The works will see the construction of two, 4 storey buildings and the improvement of open spaces, play area and hard landscaping on the former garages site. The new homes will provide […]

Read More

Geffrye Place, Hoxton

As a construction company based in London we were delighted to work on an exciting residential construction project just a short walk from our Shoreditch offices in which we also acted as the developer. Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of […]

Read More

Yotel, 100 Clerkenwell Road in London

Jerram Falkus’ contractors in London worked on this hotel construction project. The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel. Planning was for demolition of all existing structures onsite which was a former Petrol […]

Read More

Macmillan Cancer Support Centre

Our company worked on the building construction project for Macmillan Cancer. The project comprised a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and […]

Read More

Hintze Hall Refurbishment, Natural History Museum

Our London refurbishment contractors worked on one of our most prestigious projects. The Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised a replacement of roof lights and conservation of the building’s […]

Read More

EKO Pathways School, Education Construction

Our London building contractors worked on education construction project – Eleanor Smith School.  Eleanor Smith School (EKO pathways) is a special educational needs school based across two sites in the London Borough of Newham. Our new-build developers worked on a new build site that provides the School with a brand-new facility constructed on a brownfield […]

Read More

St Benedict’s School, New Ark, School Construction

St Benedict’s is a leading independent catholic co-educational school providing education from nursery through to sixth form. We were appointed after the success of previous school construction work for the Sixth Form and Art Design & Technology Building. This school construction project, the New Ark, will re-provide classrooms for the Junior School and bring the […]

Read More

Latymer Upper School Sports Facility

Our local building contractors worked on the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming […]

Read More