Projects

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development.

This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction of the new building on land adjacent to the orginal school. Once the new school building was complete all students and staff were decanted into the new building and the existing school building was demolished and part landscaped as school playground and sports facilities. There is SEN provision within the new build school which has been fit-out with specialist equipment as required. The external Staff Terrace is flexible and can become an outdoor area for SEN use, which has a glass balustrade to increase the height of the parapet allowing students to play safely in this area.

As the school is directly under the Heathrow flight path, it cannot be naturally ventilated due to external noise constraints. Instead it is fully mechanically ventilated via VRF ceiling concealed fan coil units. Using IES software, a fully compliant design solution has been produced which takes into account over-shading analysis and daylight assessments in calculating the heating and cooling loads, in order that cooling is only provided where absolutely necessary.

When we completed the School project, our client, Countryside Properties PLC then commenced works on site of the orginal school on a housing development to provide 250 mixed tenure homes.

Other Projects

The Foundry

This project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with an air […]

Read More

Cedar Lawn, Leyton Green Road

We are delivering the Cedar Lawn residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one bedroom, 16 two bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of the Short Break […]

Read More

Wivenhoe Road Modular Housing

Our second modular housing project for Barking and Dagenham will provide 20 new two-bedroom containerised homes. We prepared the groundworks ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping will start and we are set to complete the project within 30 weeks […]

Read More

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Sebastian Court

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus to undertake the demolition of the original Sebastian Court buildings, and enabling works in preparation of the a new high-quality affordable housing development on the site. Jerram Falkus completed the demolition and commenced piling for the new residential blocks and began constructing the new substation […]

Read More

Putney High School, GDST

The construction of a new 2000m2 building for Putney High School, part of the Girls’ Day Trust, to provide nine new science labs, a drama studio, a new music department and a forum to develop the practice and performance of the spoken word. The project also includes associated canteen refurbishment and external works. The building […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

Wesley House, Cambridge

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

Kingston House and Oman Avenue, Brent

Two housing schemes with Brent Housing Partnership for Brent Council which will provide nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single storey detached bungalows (1x 3 bed and 1x 1 bed) Oman Avenue – […]

Read More