Projects

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development.

This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction of the new building on land adjacent to the orginal school. Once the new school building was complete all students and staff were decanted into the new building and the existing school building was demolished and part landscaped as school playground and sports facilities. There is SEN provision within the new build school which has been fit-out with specialist equipment as required. The external Staff Terrace is flexible and can become an outdoor area for SEN use, which has a glass balustrade to increase the height of the parapet allowing students to play safely in this area.

As the school is directly under the Heathrow flight path, it cannot be naturally ventilated due to external noise constraints. Instead it is fully mechanically ventilated via VRF ceiling concealed fan coil units. Using IES software, a fully compliant design solution has been produced which takes into account over-shading analysis and daylight assessments in calculating the heating and cooling loads, in order that cooling is only provided where absolutely necessary.

When we completed the School project, our client, Countryside Properties PLC then commenced works on site of the orginal school on a housing development to provide 250 mixed tenure homes.

Other Projects

Baldwin Terrace

The partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

East End Thames View

The redevelopment of the eastern end of the Thames View Estate in Barking provides 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works involved the construction of five apartment blocks running north to south along the […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Geffrye Place, Hoxton

The Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of Hackney. The scheme comprised both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent. The existing public house listed building has been stabilised, retained and […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Wesley House, Cambridge

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

St Christopher’s Hospice, Learning Hub

St Christopher’s Hospice provides skilled and compassionate end of life care and bereavement support of the highest quality, combining specialist care, research and education. Jerram Falkus is undertaking The Learning Hub project for the Hospice which will provide; A flexible lecture space for up to 120 people, which can divide into three smaller teaching rooms […]

Read More

The Foundry

This project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with an air […]

Read More

Weighbridge Modular Housing

Our first modular housing project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Jerram Falkus completed all of the enabling works and infrastructure […]

Read More

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

Kingston House and Oman Avenue, Brent

Two housing schemes with Brent Housing Partnership for Brent Council which will provide nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single storey detached bungalows (1x 3 bed and 1x 1 bed) Oman Avenue – […]

Read More