Hounslow Town Primary

Jerram Falkus Construction recently completed one of one of our most prestigious projects, The £20m project has provided a new five form entry primary school just off the High Street in Hounslow. This reinforced concrete framed, brick clad school building will be part two and part three storey, and is located on land adjacent to the existing school. Once completed, the existing school will be demolished and part of that site landscaped as school playground and sports facilities.

There is SEN provision within the new build school which has been fit out to the normal classroom standard. The school will now fit-out with specialist equipment as required. The external Staff Terrace will become an outdoor area for SEN use, which has a glass balustrade to increase the height of the parapet which will allow students to play safely in this area. As the school is directly under the Heathrow flight path, It cannot be naturally ventilated due to external noise constraints Instead it must be fully mechanically ventilated via VRF ceiling concealed fan coil units. Using IES software, a fully compliant design solution has been produced which takes into account over-shading analysis and daylight assessments in calculating the heating and cooling loads, in order that cooling is only provided where absolutely necessary.

 

Once the school building is complete and students and staff have fully decanted into the building our client, Countryside Properties PLC will then develop the remainder of the site to provide 250 mixed tenure homes.

Other Projects

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

Sebastian Court

Demolition of the original block of flats, in preparation for an exciting new affordable housing development on the site. The new Sebastian Court development will provide 95 affordable and quality homes for local people, an increase of 30 units when compared to the original building now being demolished.   The works include the demolition of […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More

Geffrye Place

The development on the site of 32 Cremer Street is situated adjacent to Geffrye Museum in Hoxton in the London Borough of Hackney. The scheme comprises both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent to the existing 32 Cremer Street. The existing building has been […]

Read More

New Grandview, Oakwood Adult Autism Unit

The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, and gardens, all specifically designed for people with autism and mental health […]

Read More

Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new […]

Read More

Geffrye Place/Cremer Street

The development on the site of 32 Cremer Street is situated adjacent to Geffrye Museum in Hoxton in the London Borough of Hackney.   The scheme comprises both the former Marquis of Lansdown public house and a new four storey building adjacent to the existing 32 Cremer Street. The existing building has been stabilised, retained […]

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices.   Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete […]

Read More

Ranelagh Primary School

A new build two storey 600m2 extension and internal refurbishment works at an existing primary school in Newham. The new extension, designed by Rivington Street Studio Architects, provides much needed new entrance and additional space for a nursery and staff resource areas plus new studio area at 1st floor level.

Read More

University of Creative Arts, Farnham

Jerram Falkus is currently on site at the University of Creative Arts campus in Farnham undertaking the design and construction of a new Film and Media Centre. The new building will provide specialist facilities for film and media students.   The two-storey development is designed to house the technology and specialist equipment needed to prepare […]

Read More

Eleanor Smith School

Eleanor Smith School is a special educational needs school based across two sites in the London Borough of Newham. This new build site provides the School with a brand-new facility constructed on a brownfield site in East Ham.   The new Eleanor Smith School site caters for children and young people with social, emotional and […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More