Baldwin Terrace, Commercial Construction Project

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace.

The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus a lower ground floor at canal level, and one apartment deep to enable dual aspect accommodation. The building accommodates a row of four duplex units with their own front door and living spaces at street level on the ground floor, and bedrooms at canal level below which are set back behind a garden wall for privacy and security. The remaining eight units are paired on each upper floor, with the two penthouse apartments enjoying south-facing corner terraces at the top.

The new apartments were designed to EcoHomes ‘Very Good’ at planning stage. To celebrate the waterside and sunny location, the apartments are generously proportioned with spacious open plan living, dining and kitchen area. A layered south facade of sliding windows and louvres will enable the residents to passively control the internal environment and enjoy the view, air, light and sun. Besides an energy efficient thermal envelope and solar shading, a ground source heat pump fulfils the renewables requirement. Falkus Joinery provided the bespoke kitchens and duplex staircases.

Looking for a commercial construction company to help with your project? Contact us today. We are an established construction company in London and South- East with extensive experience of more than 135 years. Our company has worked on a variety of commercial construction projects. Check out our other projects to learn more.

Other Projects

Respite Care Haydock Avenue, Healthcare Construction

Our construction company is delighted to have worked on this healthcare project where we completed a specially-designed respite facility for Ealing Council. The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two form to three form entry to provide capacity for over 630 children. Our London based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings […]

Read More

92 Leyton Green Road, Residential Construction

We are delivering the 92 Leyton Green residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one bedroom, 16 two bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of the Short […]

Read More

The Foundry, Refurbishment Project

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with […]

Read More

Haberdashers’ Aske’s Boys’ School

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More

Modular Construction Brochure

OUR Modular EXPERTISE Jerram Falkus’ modular and off site construction experience has broadened over the years and we are seeing an increase in demand to find new construction solutions. We have found modular construction to be a huge benefit to our public sector clients who are looking for less disruption, less waste and have education […]

Read More

The Pump House, Walthamstow, Residential Construction

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality […]

Read More

Latymer Upper School Sports Facility

Our local building contractors worked on the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming […]

Read More

Kingston House and Oman Avenue, Home Construction

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More

Shetland Road, Bow

We are undertaking the £5.4m design and build contract for 19 new build low energy homes at Shetland Road, Bow in East London. The works will see the construction of two, 4 storey buildings and the improvement of open spaces, play area and hard landscaping on the former garages site. The new homes will provide […]

Read More

Macmillan Cancer Support Centre

Our company worked on the building construction project for Macmillan Cancer. The project comprised a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced […]

Read More

Yotel, 100 Clerkenwell Road in London

Jerram Falkus’ contractors in London worked on this hotel construction project. The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel. Planning was for demolition of all existing structures onsite which was a former Petrol […]

Read More