Projects

Kingsbridge Terraces, Barking

The construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.

 

All of the properties have private front and back gardens or terraces, in addition to their own individual entrances and all of the kitchens were designed and supplied by Jerram Falkus’ joinery division Falkus Joinery. The properties will be available under shared ownership.

Other Projects

Wesley House

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

St Benedict’s School, New Ark

St Benedict’s is a leading independent catholic co-educational school providing education from nursery through to sixth form. We were appointed after the success of the Sixth Form and Art Design & Technology Building. This project, the New Ark, will re-provide classrooms for the Junior School and bring the Nursery on to the school site in […]

Read More

East End Thames View

The redevelopment of the eastern end of the Thames View Estate in Barking provides 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration.   The works involved the construction of five apartment blocks running north to south along […]

Read More

Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures […]

Read More

Geffrye Place

The development on the site of 32 Cremer Street is situated adjacent to Geffrye Museum in Hoxton in the London Borough of Hackney. The scheme comprises both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent to the existing 32 Cremer Street. The existing building has been […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School is expanding from two form to three form entry with capacity for over 630 children. We have constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings will accommodate two new classrooms, three SEN […]

Read More

Eleanor Smith School

Eleanor Smith School is a special educational needs school based across two sites in the London Borough of Newham. This new build site provides the School with a brand-new facility constructed on a brownfield site in East Ham.   The new Eleanor Smith School site caters for children and young people with social, emotional and […]

Read More

The Anning Rooms, Natural History Museum

An exclusive Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, works to the towers on the 2nd and 3rd floors are being developed concurrently.   The remodelling […]

Read More

Geffrye Place/Cremer Street

The development on the site of 32 Cremer Street is situated adjacent to Geffrye Museum in Hoxton in the London Borough of Hackney.   The scheme comprises both the former Marquis of Lansdown public house and a new four storey building adjacent to the existing 32 Cremer Street. The existing building has been stabilised, retained […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new […]

Read More

The Foundry, Building B

The works to this Grade II Listed former canal-side wharf building were designed by their owner and occupant, Cullinan Studio. Achieving BREEAM ‘Excellent’ rating, the Foundry is naturally cross-ventilated while an air source heat pump serves under-floor heating. A new independent steel frame on isolated pad foundations was constructed within the existing building to support […]

Read More