Projects

Latymer Upper School Sports Facility

Our local building contractors worked on the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices.

Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete frame with Metsec inner walling system and externally clad with Fibre-C panels, Reglit glazing and insulated Sto render.

Extensive mechanical and electrical services included pool filtration and heating plant, roof mounted air handling, and cooling to the dance and fitness studios. The existing adjacent Sport Hall was refurbished including new external insulated Fibre-C wall cladding, roof cladding, new sports floor, internal fitting out and new services including heating, ventilation and lighting.

Looking for the perfect local building contractors to fulfill your project needs? Look no further. At Jerram Falkus, we take pride in delivering top-level work. We are one of the established building companies in London and South East, operating for more than 135 years and working on a range of projects across various industries including; education, heritage, modular, leisure, residential, Passivhaus, healthcare, and more. Get in touch with us for more information.

Other Projects

Yotel, 100 Clerkenwell Road in London

Jerram Falkus’ contractors in London worked on this hotel construction project. The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel. Planning was for demolition of all existing structures onsite which was a former Petrol […]

Read More

David & Anne Street, Newham

We have been appointed to deliver the construction of affordable housing for the London Borough of Newham’s Wave 1 of infill sites identified for the affordable home programme 2018-2022. All of the projects are specified to be low energy homes a mixture of houses, flats and maisonettes designed to Passivhaus Standards. David Street The project […]

Read More

Kingsbridge Terraces, Residential Building Construction

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All […]

Read More

Haberdashers’ Aske’s Boys’ School

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More

The Pump House, Walthamstow, Residential Construction

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality […]

Read More

Park Primary School, Expansion Project

Our construction firm workedon the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof […]

Read More

Sebastian Court, New Build Development

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus Construction to undertake the demolition of the original 1960s Sebastian Court estate buildings which had fallen into disrepair, before commencing enabling works and the construction of a 95 new high-quality affordable homes on the site. Following the demolition works, we commenced piling for the three […]

Read More

St Christopher’s Hospice, Learning Hub

St Christopher’s Hospice provides skilled and compassionate end-of-life care and bereavement support of the highest quality, combining specialist care, research and education. Jerram Falkus was appointed to work on the construction of this educational project for the healthcare industry. The Learning Hub project for the Hospice which will provide; A flexible lecture space for up […]

Read More

Wesley House, Theological College, Cambridge

Our contractors worked on this education and heritage project including both refurbishment and new build work. Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. Our refurbishment and new build contractors worked on; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of […]

Read More

New Grandview, Oakwood Adult Autism Unit

As a residential construction company we worked on a great medical project. The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, […]

Read More

Ark Soane, Acton

We are delighted to be delivering this £52m design and build project for Countryside and the Department for Education. One of our largest construction projects in recent years, the Ark Soane project will see the construction of combined education and residential development in Acton. The Ark Soane mixed-use project will see the construction of; part […]

Read More

Baldwin Terrace, Commercial Construction Project

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in […]

Read More