Projects

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices.

Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete frame with Metsec inner walling system and externally clad with Fibre-C panels, Reglit glazing and insulated Sto render.

Extensive mechanical and electrical services included pool filtration and heating plant, roof mounted air handling, and cooling to the dance and fitness studios.The existing adjacent Sport Hall was refurbished including new external insulated Fibre-C wall cladding, roof cladding, new sports floor, internal fitting out and new services including heating, ventilation and lighting.

Other Projects

Kingston House and Oman Avenue, Brent

Two housing schemes with Brent Housing Partnership for Brent Council which will provide nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single storey detached bungalows (1x 3 bed and 1x 1 bed) Oman Avenue – […]

Read More

Peckham Palms, Hair and Beauty Hub

The Palms is a retail space, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to a new build purpose designed facility on the site of former disused […]

Read More

The Foundry

This project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with an air […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Geffrye Place, Hoxton

The Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of Hackney. The scheme comprised both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent. The existing public house listed building has been stabilised, retained and […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

University for Creative Arts, Farnham

The design and construction of a new Film and Media Centre at the University for Creative Arts campus in Farnham. The new building has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare today’s creative students for industry. Construction took place […]

Read More

St Christopher’s Hospice, Learning Hub

St Christopher’s Hospice provides skilled and compassionate end of life care and bereavement support of the highest quality, combining specialist care, research and education. Jerram Falkus is undertaking The Learning Hub project for the Hospice which will provide; A flexible lecture space for up to 120 people, which can divide into three smaller teaching rooms […]

Read More

Kingsbridge Terraces, Barking

The construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All of […]

Read More

Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures […]

Read More

EKO Pathways/Eleanor Smith School

Eleanor Smith School (EKO pathways) is a special educational needs school based across two sites in the London Borough of Newham. This new build site provides the School with a brand-new facility constructed on a brownfield site in East Ham. The new Eleanor Smith School site caters for children and young people with social, emotional […]

Read More

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development. This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction […]

Read More