Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new art room, along with a reorganisation of external play space. This will increase the school from a 2.5 form entry primary school to a full 3 form entry.

 

Occupying an extremely compact site overlooking West Ham Park, the scheme concentrates the expansion in two opposite areas of the school site in order to enhance the building and to provide a cohesive layout which works with the existing school. The building’s elevations, using terracotta tiles on an aluminium rainscreen system complement the existing building’s traditional Victorian masonry. The steel structural frame raises the accommodation off the ground to provide a new entrance and an undercroft play space.

 

Both extensions join the existing building with a light touch with glazed circulation spaces. The project also provides some remodelled areas within the existing school in the way of new toilets and enhanced fire lobbies.

Other Projects

Geffrye Place/Cremer Street

The development on the site of 32 Cremer Street is situated adjacent to Geffrye Museum in Hoxton in the London Borough of Hackney.   The scheme comprises both the former Marquis of Lansdown public house and a new four storey building adjacent to the existing 32 Cremer Street. The existing building has been stabilised, retained […]

Read More

Wesley House

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

New Grandview, Oakwood Adult Autism Unit

The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, and gardens, all specifically designed for people with autism and mental health […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More

Ranelagh Primary School

A new build two storey 600m2 extension and internal refurbishment works at an existing primary school in Newham. The new extension, designed by Rivington Street Studio Architects, provides much needed new entrance and additional space for a nursery and staff resource areas plus new studio area at 1st floor level.

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices.   Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More

Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures […]

Read More

Kingsbridge Terraces, Barking

The construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All of […]

Read More

University of Creative Arts, Farnham

Jerram Falkus is currently on site at the University of Creative Arts campus in Farnham undertaking the design and construction of a new Film and Media Centre. The new building will provide specialist facilities for film and media students.   The two-storey development is designed to house the technology and specialist equipment needed to prepare […]

Read More