Projects

Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new art room, along with a reorganisation of external play space. This will increase the school from a 2.5 form entry primary school to a full 3 form entry.

 

Occupying an extremely compact site overlooking West Ham Park, the scheme concentrates the expansion in two opposite areas of the school site in order to enhance the building and to provide a cohesive layout which works with the existing school. The building’s elevations, using terracotta tiles on an aluminium rainscreen system complement the existing building’s traditional Victorian masonry. The steel structural frame raises the accommodation off the ground to provide a new entrance and an undercroft play space.

 

Both extensions join the existing building with a light touch with glazed circulation spaces. The project also provides some remodelled areas within the existing school in the way of new toilets and enhanced fire lobbies.

Other Projects

New Grandview, Oakwood Adult Autism Unit

The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, and gardens, all specifically designed for people with autism and mental health […]

Read More

Baldwin Terrace

The partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus […]

Read More

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

Geffrye Place, Hoxton

The Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of Hackney. The scheme comprised both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent. The existing public house listed building has been stabilised, retained and […]

Read More

Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures […]

Read More

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development. This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction […]

Read More

St John’s and St James

We have been appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of a four storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The project also includes the […]

Read More

St Benedict’s School, New Ark

St Benedict’s is a leading independent catholic co-educational school providing education from nursery through to sixth form. We were appointed after the success of the Sixth Form and Art Design & Technology Building. This project, the New Ark, will re-provide classrooms for the Junior School and bring the Nursery on to the school site in […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed to expand from two form to three form entry to provide capacity for over 630 children. We constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two new classrooms, three […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More