Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new art room, along with a reorganisation of external play space. This will increase the school from a 2.5 form entry primary school to a full 3 form entry.

 

Occupying an extremely compact site overlooking West Ham Park, the scheme concentrates the expansion in two opposite areas of the school site in order to enhance the building and to provide a cohesive layout which works with the existing school. The building’s elevations, using terracotta tiles on an aluminium rainscreen system complement the existing building’s traditional Victorian masonry. The steel structural frame raises the accommodation off the ground to provide a new entrance and an undercroft play space.

 

Both extensions join the existing building with a light touch with glazed circulation spaces. The project also provides some remodelled areas within the existing school in the way of new toilets and enhanced fire lobbies.

Other Projects

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

The Anning Rooms, Natural History Museum

An exclusive Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, works to the towers on the 2nd and 3rd floors are being developed concurrently.   The remodelling […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Ranelagh Primary School

A new build two storey 600m2 extension and internal refurbishment works at an existing primary school in Newham. The new extension, designed by Rivington Street Studio Architects, provides much needed new entrance and additional space for a nursery and staff resource areas plus new studio area at 1st floor level.

Read More

Kingsbridge Terraces, Barking

The construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All of […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More

Peckham Palms, Hair and Beauty Hub

The Palms is a retail space, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to a new build purpose designed facility on the site of former disused […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School is expanding from two form to three form entry with capacity for over 630 children. We have constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings will accommodate two new classrooms, three SEN […]

Read More

St Benedict’s School, New Ark

St Benedict’s is a leading independent catholic co-educational school providing education from nursery through to sixth form. We were appointed after the success of the Sixth Form and Art Design & Technology Building. This project, the New Ark, will re-provide classrooms for the Junior School and bring the Nursery on to the school site in […]

Read More

52 Whitmore Road (mixed use CLT)

52 Whitmore Road is a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double height photographer’s studio and three duplex flats with roof terraces. The Cross Laminated Timber (CLT) structure was completed […]

Read More