Projects

Putney High School, GDST

Our school construction company worked on the construction of a new 2000m2 building for Putney High School, part of the Girls’ Day Trust, to provide nine new science labs, a drama studio, a new music department and a forum to develop the practice and performance of the spoken word. The project also includes associated canteen refurbishment and external works.

The building will replace the former timber framed, brick and glass clad science block that was built in the early 1970s increasing the amount of teaching space and also offering more focused and flexible learning environments for the students.

Constructed mainly of London brick and inspired by classical proportions, the building will feature copper clad strips alongside the main windows. The south-facing facade at the heart of the site has a colonnade that provides solar shading to minimise heat gains and glare and maximise daylight in the teaching spaces, all aspects that have a crucial impact on learning.

Looking for a construction company for your school project? Say no more. Jerram Falkus are here to help. We are an experienced construction company with experience across a range of industries. Our company has worked on various education and school construction projects. Get in touch for more information!

Other Projects

Wivenhoe Road, Modular Housing Construction

Our company worked on our second modular housing construction project for Barking and Dagenham and will provide 20 new two-bedroom containerised homes. We prepared the groundworks ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping took place and we completed the project […]

Read More

Latymer Upper School Sports Facility

Our local building contractors worked on the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming […]

Read More

The Foundry, Refurbishment Project

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with […]

Read More

New Grandview, Oakwood Adult Autism Unit

As a residential construction company we worked on a great medical project. The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two form to three form entry to provide capacity for over 630 children. Our London based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings […]

Read More

The Pump House, Walthamstow, Residential Construction

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality […]

Read More

Weighbridge Modular Housing Construction

Our modular building manufacturers’ first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of […]

Read More

52 Whitmore Road (mixed use CLT)

As one of London’s commercial construction companies we worked on the 52 Whitmore Road project, a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double-height photographer’s studio and three duplex flats with […]

Read More

Yotel, 100 Clerkenwell Road in London

Jerram Falkus’ contractors in London worked on this hotel construction project. The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel. Planning was for demolition of all existing structures onsite which was a former Petrol […]

Read More

Cannock Mill Cohousing Project

Our London building contractors worked on a unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the residential construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the […]

Read More

St John’s and St James, New Homes Construction

We are pleased to be appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of a four storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The project also […]

Read More

Sebastian Court, New Build Development

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus Construction to undertake the demolition of the original 1960s Sebastian Court estate buildings which had fallen into disrepair, before commencing enabling works and the construction of a 95 new high-quality affordable homes on the site. Following the demolition works, we commenced piling for the three […]

Read More