The Anning Rooms, Natural History Museum, South Kensington

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd floors.

The remodelling and refurbishment work by our company on this project includes; the Welcoming Reception lobby, a restaurant, kitchen and wash up areas, a bar and lounge, informal study space and reading room and events space, new WC and passenger lift and a new environmentally controlled storage room to house a Botany Specimen Collection.

Access to the spaces is via the second floor of Hintze Hall with some of the works undertaken above areas frequented by both visitors and staff, which remained occupied during the works. The consultation was required with key stakeholders to identify works that needed to be carried out outside opening hours (including working around evening events) and identification of temporary works or closure of any adjacent areas. and conservation of the building’s listed fabric which acts as the gateway to the Museum.

Get in touch today if you want an established construction company to help with your heritage or historic project.

Other Projects

309 Regent Street, University of Westminster

Jerram Falkus are undertaking refurbishment works on this Grade II Listed Building in the heart of the Capital. The site is the flagship building for the University of Westminster. Given the historic nature of the building and the prominent location, Jerram Falkus have been working closely with the Planning Officer at Westminster City Council. Located […]

Read More

Weighbridge, Dagenham

Our first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of the enabling works […]

Read More

Tollgate Primary School, Plaistow

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two-form to three-form entry to provide capacity for over 630 children. Our London-based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two […]

Read More

New Grandview, Oakwood Adult Autism Unit, Caterham, Surrey

As a residential construction company we worked on a great medical project. The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, […]

Read More

Shetland Road, Bow

We undertook the £5.4m design and build contract for 19 new build low energy homes at Shetland Road, Bow in East London. The works saw the construction of two, 4 storey buildings and the improvement of open spaces, play area and hard landscaping on the former garages site. The new homes provide a mixture of; […]

Read More

St Benedict’s School, New Ark, Ealing

Jerram Falkus takes immense pride in announcing the successful completion of the New Ark project at St Benedict’s School in Ealing. Following the triumph of prior construction endeavours for the school’s Sixth Form and Art Design & Technology Building, our appointment reaffirms our expertise in creating educational environments that inspire learning and growth.  Project Vision   […]

Read More

EKO Pathways School, Newham

We are a London-based construction company who completed and education construction project – the Eleanor Smith School, also known as EKO Pathways, located in the London Borough of Newham. This project was built to provide children and young people with social, emotional, and mental health difficulties with a state-of-the-art facility that caters to their unique […]

Read More

32 Cremer Street, Hoxton

As a construction company based in London, we were delighted to work on an exciting residential construction project just a short walk from our Shoreditch offices in which we also acted as the developer. Jerram Development’s project is situated on Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough […]

Read More

Latymer Upper School Sports Facility, Hammersmith

Our local building contractors worked on the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming […]

Read More

Gloucester Avenue & Frontenac

Jerram Falkus Construction delivered two housing projects for Brent Council. The design and build contract covered two new residential sites; Gloucester Close and Frontenac on Donnington Road. The two developments will provide a mixture of flats and houses in line with the borough’s current housing commitments; Gloucester Close – 2 x two-bed houses and 3 […]

Read More

St John and St James Church, Tottenham

We are currently delivering a Grade II listed church refurbishment project and residential development on Great Cambridge Road, Tottenham, for the Christian Action Housing Association. The scheme will see the demolition of the existing church hall in St John and St James Church, followed by the construction of a single-storey extension to the building’s existing […]

Read More

Kingston House and Oman Avenue, Brent

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More