Seven Islands Leisure Centre, Rotherhithe

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building.

The building refurbishment provides a new reception area and changing village, as well as a refreshed multi-purpose studio. The swimming pool has undergone a complete refurbishment and has been fully retiled, with a new sauna and steam room installed. A new passenger lift was installed and the basement air handling unit plant replaced with a modern efficient system. Elements with Contractors Design Portion for the complex Mechanical & Electrical installations were co-ordinated through our supply chain partners which included – Builder’s Work & Penetrations, Co-ordination of the services, Containment, brackets and supports, Building Management System controls, hardware and software, Security systems, Fire alarm, Lift system design and Gas system/service. The Reception Counter design was undertaken by the CAD Design Team at Falkus Joinery.

Get in touch today if you want an established construction company to help with your sport or leisure construction project.

Other Projects

32 Cremer Street, Hoxton

As a construction company based in London, we were delighted to work on an exciting residential construction project just a short walk from our Shoreditch offices in which we also acted as the developer. Jerram Development’s project is situated on Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough […]

Read More

The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership. All foundations were piled due to poor quality of […]

Read More

Ark Soane, Acton

Construction works are currently underway at Ark Soane, a £52m design and build scheme for Countryside and the Department for Education. This mixed-use project will see the creation of a combined education and residential development in Acton, one of our largest construction projects in recent years. Educational Development LocatED Property Ltd, an arms-length body to […]

Read More

The Anning Rooms, Natural History Museum, South Kensington

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and […]

Read More

Kingston House and Oman Avenue, Brent

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More

Arnold Road, Bow – A Beacon of Affordable Housing in East London

Nestled in the vibrant heart of Bow, East London, Jerram Falkus is making tangible strides in residential development with our Arnold Road project, an ambitious £24.5 million undertaking for the London Borough of Tower Hamlets. This development is a construction endeavour and a community-centric initiative to bolster affordable housing options in the bustling metropolis.  Project […]

Read More

Gloucester Avenue & Frontenac

Jerram Falkus Construction delivered two housing projects for Brent Council. The design and build contract covered two new residential sites; Gloucester Close and Frontenac on Donnington Road. The two developments will provide a mixture of flats and houses in line with the borough’s current housing commitments; Gloucester Close – 2 x two-bed houses and 3 […]

Read More

Haberdashers’ Aske’s Boys’ School, Elstree, Hertfordshire

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More

Ranelagh Primary School, Stratford

Our building firms London-based construction team completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much-needed new entrance and additional space for a nursery and staff resource areas, […]

Read More

Kingsbridge Terraces, Barking

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre. All of […]

Read More

Revitalising Barking: The Roxwell Road Residential Project

In collaboration with the London Borough of Barking and Dagenham regeneration company, Be First, Jerram Falkus is revitalising the Barking landscape with the Roxwell Road residential development.  Project Overview  The project entails demolishing existing structures to make way for a contemporary residential ensemble that promises affordability and quality living. The development will feature 87 new […]

Read More

Tollgate Primary School, Plaistow

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two-form to three-form entry to provide capacity for over 630 children. Our London-based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two […]

Read More