Projects

Shetland Road, Bow

We are undertaking the £5.4m design and build contract for 19 new build low energy homes at Shetland Road, Bow in East London.

The works will see the construction of two, 4 storey buildings and the improvement of open spaces, play area and hard landscaping on the former garages site.

The new homes will provide a mixture of; 3 x four bed, 4 x three bed, 3 x two bed and 9 x one bed properties. The project works are to commence summer 2021 and we look forward to working with the London Borough of Tower Hamlets to deliver this social housing construction project.

If you are looking for a construction company to help with a residential project we would be happy to help. We have a great experience with housing construction in both the social and private sectors. Get in touch today! 

Other Projects

St John and St James Church, Tottenham

We are currently delivering a Grade II listed church refurbishment project and residential development on Great Cambridge Road, Tottenham, for the Christian Action Housing Association. The scheme will see the demolition of the existing church hall in St John and St James Church, followed by the construction of a single-storey extension to the building’s existing […]

Read More

Sebastian Court, Barking

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus Construction to undertake the demolition of the original 1960s Sebastian Court estate buildings which had fallen into disrepair, before commencing enabling works and the construction of a 95 new high-quality affordable homes on the site. Following the demolition works, we commenced piling for the three […]

Read More

University for Creative Arts, Farnham Campus, Surrey

The design and construction of a new Film and Media education Centre at the University for Creative Arts campus in Farnham. Our construction team worked on this new education building which has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare […]

Read More

92 Leyton Green Road, Leyton

We are delivering the 92 Leyton Green residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one-bedroom, 16 two-bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of the Short Break respite […]

Read More

Seven Islands Leisure Centre, Rotherhithe

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The building refurbishment provides a new reception area and changing […]

Read More

David Street & Anne Street, Newham

We are currently delivering two housing projects for the London Borough of Newham. The two schemes are part of Wave 1 of infill sites identified for the borough’s affordable home 2018-2022 programme. Together the two schemes will see the construction of a combination of houses, flats and maisonettes. Both projects will produce low energy homes […]

Read More

The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality […]

Read More

Ark Soane, Acton

We are delighted to be delivering this £52m design and build project for Countryside and the Department for Education. One of our largest construction projects in recent years, the Ark Soane project will see the construction of combined education and residential development in Acton. The Ark Soane mixed-use project will see the construction of; part […]

Read More

The Foundry, Islington

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with […]

Read More

Baldwin Terrace, Islington

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in […]

Read More

Modular Construction Brochure

OUR Modular EXPERTISE Jerram Falkus’ modular and off site construction experience has broadened over the years and we are seeing an increase in demand to find new construction solutions. We have found modular construction to be a huge benefit to our public sector clients who are looking for less disruption, less waste and have education […]

Read More

Park Primary School, Stratford

Our construction firm worked on the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a […]

Read More