St Benedict’s School, New Ark

St Benedict’s is a leading independent catholic co-educational school providing education from nursery through to sixth form. We were appointed after the success of the Sixth Form and Art Design & Technology Building. This project, the New Ark, will re-provide classrooms for the Junior School and bring the Nursery on to the school site in a single, high performance, very low energy building, built to the very demanding ‘Passivhaus’ standard.

 

The children will benefit from state-of-the-art spacious classrooms, with the Nursery and Reception classrooms opening out directly onto an outdoor learning and play area. The Junior School will also gain a new entrance hall and a Home Economics facility. Works involved the demolition of the existing single storey brick built structure and the construction of a new three storey cross laminated timber structure with brick cladding to form new teaching space, totalling 1600m2. The project took place whilst the school was in occupation and access and safety of the staff and students had to be managed accordingly.

Other Projects

Wesley House, Cambridge

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Geffrye Place, Hoxton

The Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of Hackney. The scheme comprised both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent. The existing public house listed building has been stabilised, retained and […]

Read More

St John’s and St James

We have been appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of a four storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The project also includes the […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

Putney High School, GDST

The construction of a new 2000m2 building for Putney High School, part of the Girls’ Day Trust, to provide nine new science labs, a drama studio, a new music department and a forum to develop the practice and performance of the spoken word. The project also includes associated canteen refurbishment and external works. The building […]

Read More

Kingsbridge Terraces, Barking

The construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All of […]

Read More

East End Thames View

The redevelopment of the eastern end of the Thames View Estate in Barking provides 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works involved the construction of five apartment blocks running north to south along the […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Ranelagh Primary School

We have completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much needed new entrance and additional space for a nursery and staff resource areas, plus new studio […]

Read More