Projects

St John’s and St James, New Homes Construction

We are pleased to be appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of new homes including a four-storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage.

The project also includes the construction of a single-storey extension to the existing Grade II listed church’s front entrance, as well as re-modelling and alteration of this area and refurbishment of the church interior including mechanical & electrical services, external works and below ground drainage.

In order to allow for church services to continue, a 32ft long temporary and mobile church with disability access has been installed adjacent to our site office.

Looking for a construction team to help build new homes as part of your residential project? Jerram Falkus are here to help. Contact us today.

Other Projects

Respite Care Haydock Avenue, Healthcare Construction

Our construction company is delighted to have worked on this healthcare project where we completed a specially-designed respite facility for Ealing Council. The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. […]

Read More

Ranelagh Primary School, Education Construction

Our building firms London-based construction team completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much needed new entrance and additional space for a nursery and staff resource […]

Read More

Macmillan Cancer Support Centre

Our company worked on the building construction project for Macmillan Cancer. The project comprised a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced […]

Read More

The Foundry, Refurbishment Project

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with […]

Read More

Seven Islands Leisure Centre, Building Refurbishment

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The building refurbishment provides a new reception area and changing […]

Read More

Hintze Hall Refurbishment, Natural History Museum

Our London refurbishment contractors worked on one of our most prestigious projects. The Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised a replacement of roof lights and conservation of the building’s […]

Read More

EKO Pathways School, Education Construction

Our London building contractors worked on education construction project – Eleanor Smith School.  Eleanor Smith School (EKO pathways) is a special educational needs school based across two sites in the London Borough of Newham. Our new-build developers worked on a new build site that provides the School with a brand-new facility constructed on a brownfield […]

Read More

Park Primary School, Expansion Project

Our construction firm workedon the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof […]

Read More

Ark Soane, Acton

We are delighted to be delivering this £52m design and build project for Countryside and the Department for Education. One of our largest construction projects in recent years, the Ark Soane project will see the construction of a combined education and residential development in Acton. The Ark Soane mixed-use project will see the construction of; […]

Read More

Hounslow Town Primary School, New Build Project

As a new build construction company, Hounslow Town Primary was one of our most prestigious education projects, the £20m new build school project has provided a new five-form entry primary school just off the High Street in Hounslow, within site of wider housing development. Our reinforced concrete framed, brick clad school building is part two […]

Read More

The Palms Retail Space London, New Build Development

Our new-build developers worked on The Palms retail space, one of the new build developments, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to new build  purpose-designed […]

Read More

52 Whitmore Road (mixed use CLT)

As one of London’s commercial construction companies we worked on the 52 Whitmore Road project, a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double-height photographer’s studio and three duplex flats with […]

Read More