Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping.

As part of its shared ownership new homes delivery programme, Sempra is working in partnership with Homes England and is supporting Basildon Council with its ambition to give priority to the borough’s key workers to access housing. Key workers include nurses, teachers, police and other public servants.

The project has been developed using traditional methods of construction consisting of mass concrete strip foundations, brick and block walls with beam and block flooring at ground floor. Precast planks will be used for upper floors to all flats and engineered timber floor joists to the houses. Roofs will be constructed using off-site fabricated roof trusses, with the exception of the second floor of flats which will be constructed in a steel framed pitch with cut and pitched timber infill. All roofs including bays and dormers with have concrete tiled coverings.

Other Projects

Ranelagh Primary School

We have completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much needed new entrance and additional space for a nursery and staff resource areas, plus new studio […]

Read More

Sebastian Court

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus to undertake the demolition of the original Sebastian Court buildings, and enabling works in preparation of the a new high-quality affordable housing development on the site. Jerram Falkus completed the demolition and commenced piling for the new residential blocks and began constructing the new substation […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete frame […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Kingsbridge Terraces, Barking

The construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All of […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed to expand from two form to three form entry to provide capacity for over 630 children. We constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two new classrooms, three […]

Read More

St Benedict’s School, New Ark

St Benedict’s is a leading independent catholic co-educational school providing education from nursery through to sixth form. We were appointed after the success of the Sixth Form and Art Design & Technology Building. This project, the New Ark, will re-provide classrooms for the Junior School and bring the Nursery on to the school site in […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Respite Care Haydock Avenue

We are delighted to have completed this specially-designed respite facility for Ealing Council.The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. Works consisted of the demolition of former garages and construction […]

Read More