Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed to expand from two form to three form entry to provide capacity for over 630 children.

We constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two new classrooms, three SEN suites, two offices and new pupil toilets. The project also comprised an infill extension which provides a new kitchen and servery along with some internal remodelling, providing three further classrooms and office space.
A bridge link at first floor level, links the two buildings physically and aesthetically in line with the school’s aim to promote a more inclusive and homogeneous school spirit.

In order to re-provide the play space lost through increasing the building footprint, a first floor play deck has been constructed. A simple palette of materials with grey brick, zinc roofing and bronze coloured louvres have been chosen in order to complement the existing buildings.

Other Projects

Ranelagh Primary School

A new build two storey 600m2 extension and internal refurbishment works at an existing primary school in Newham. The new extension, designed by Rivington Street Studio Architects, provides much needed new entrance and additional space for a nursery and staff resource areas plus new studio area at 1st floor level.

Read More

EKO Pathways/Eleanor Smith School

Eleanor Smith School (EKO pathways) is a special educational needs school based across two sites in the London Borough of Newham. This new build site provides the School with a brand-new facility constructed on a brownfield site in East Ham. The new Eleanor Smith School site caters for children and young people with social, emotional […]

Read More

Respite Care Haydock Avenue

We are delighted to have completed this specially-designed respite facility for Ealing Council.The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. Works consisted of the demolition of former garages and construction […]

Read More

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development. This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.   Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the […]

Read More

University for Creative Arts, Farnham

The design and construction of a new Film and Media Centre at the University for Creative Arts campus in Farnham. The new building has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare today’s creative students for industry. Construction took place […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

The Foundry

This project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with an air […]

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete frame […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More