Projects

Wivenhoe Road, Modular Housing Construction

Our company worked on our second modular housing construction project for Barking and Dagenham and will provide 20 new two-bedroom containerised homes.

We prepared the groundworks ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping took place and we completed the project within 30 weeks, ready for March 2021. By using off-site construction we were able to deliver these new homes faster and more efficiently to the client, on what would be a challenging site to develop using standard construction methods.

The Wivenhoe development is part of a wider programme in Barking and Dagenham that will deliver new homes to house local homeless people and families. These properties will be used for emergency or temporary housing for families who would otherwise be forced into expensive and insecure hostel and other temporary accommodation, in and outside the borough.

We were joined on site by Cllr Saima Ashraf, Deputy Leader for the London Borough of Barking and Dagenham, to see the first pre-fabricated units delivered to site in October 2020.

Cllr Ashraf said, “These new homes will be for local families who are on our council waiting list and have no permanent home. By using the latest modular technology we can build at pace so we can put a roof over their heads more quickly.”

Looking for a construction company to help with a modular housing project? Jerram Falkus are here. Modular housing construction is becoming more prevalent and our company is delighted to have worked on various modular projects. Check out our projects page to learn more! Interested? Contact us today. 

Other Projects

The Foundry, Refurbishment Project

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with […]

Read More

Cannock Mill Cohousing Project

Our London building contractors worked on a unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the residential construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the […]

Read More

Park Primary School, Expansion Project

Our construction firm workedon the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof […]

Read More

52 Whitmore Road (mixed use CLT)

As one of London’s commercial construction companies we worked on the 52 Whitmore Road project, a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double-height photographer’s studio and three duplex flats with […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and […]

Read More

Respite Care Haydock Avenue, Healthcare Construction

Our construction company is delighted to have worked on this healthcare project where we completed a specially-designed respite facility for Ealing Council. The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. […]

Read More

Ranelagh Primary School, Education Construction

Our building firms London-based construction team completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much needed new entrance and additional space for a nursery and staff resource […]

Read More

Seven Islands Leisure Centre, Building Refurbishment

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The building refurbishment provides a new reception area and changing […]

Read More

The Pump House, Walthamstow, Residential Construction

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality […]

Read More

East End Thames View, Residential Construction

Our new build builders worked on the redevelopment of the eastern end of the Thames View Estate in Barking, providing 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works of our new build builders involved the […]

Read More

Weighbridge Modular Housing Construction

Our modular building manufacturers’ first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of […]

Read More

Kingsbridge Terraces, Residential Building Construction

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All […]

Read More