Projects

Yotel, 100 Clerkenwell Road

The project ‘Clerkenwell Road’ comprises 212 Hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel.

 

Planning was for demolition of all existing structures onsite which was a former Petrol station site (including forecourt shop, canopy and pumps) and the erection of a 8 storey building plus double basement level comprising of a 212 bedroom hotel (Class C1).

 

The project also comprises 5 self-contained residential units (facing onto and entrances onto St John’s Square comprising of 4 x 3 beds & 1x 2 bed), the creation of 93 sq metres of office /workshop space (Class B1), 250 sq metres of flexible commercial floorspace (Retail A1 use & Restaurant A3 uses) all shell and core.

 

The proposed building seeks to create one linked curved building which would address both Clerkenwell Road and St John Squares frontages.

Other Projects

East End Thames View

The redevelopment of the eastern end of the Thames View Estate in Barking provides 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works involved the construction of five apartment blocks running north to south along the […]

Read More

Kingston House and Oman Avenue, Brent

Two housing schemes with Brent Housing Partnership for Brent Council which will provide nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single storey detached bungalows (1x 3 bed and 1x 1 bed) Oman Avenue – […]

Read More

Respite Care Haydock Avenue

We are delighted to have completed this specially-designed respite facility for Ealing Council.The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. Works consisted of the demolition of former garages and construction […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Seven Islands Leisure Centre

The revitalisation of this leisure centre has undergone a £1 million refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The refurbishment provides a new reception area and changing village, as […]

Read More

Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new […]

Read More

Wesley House, Cambridge

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

St Christopher’s Hospice, Learning Hub

St Christopher’s Hospice provides skilled and compassionate end of life care and bereavement support of the highest quality, combining specialist care, research and education. Jerram Falkus is undertaking The Learning Hub project for the Hospice which will provide; A flexible lecture space for up to 120 people, which can divide into three smaller teaching rooms […]

Read More

52 Whitmore Road (mixed use CLT)

52 Whitmore Road is a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double height photographer’s studio and three duplex flats with roof terraces. The Cross Laminated Timber (CLT) structure was completed […]

Read More

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development. This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction […]

Read More

New Grandview, Oakwood Adult Autism Unit

The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, and gardens, all specifically designed for people with autism and mental health […]

Read More