Projects

Haberdashers’ Aske’s Boys’ School

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures for cranage and lifting.  Logistics were further challenged by the narrow, winding Butterfly Lane being densely trafficked during school drop off and pick uptimes, and a cut-through generally, where large vehicles required the majority of the road width.

Our London construction contractors worked on the construction of a new build sports facility comprising a 25m 8-lane swimming pool, fitness suite, dance studios, administration rooms, multi- use rooms, kitchen, toilets, plant room, offices and external works and service connections. A new build steel frame constructed two/double storey building on piled foundations, pre-cast plank floors and cast-insitu waterproof concrete pool and basement plant areas.  Facades are of cavity masonry, Trespa Rainscreen cladding and glazed curtain walling with a Kalzip profiled metal roof system and external works and service connections.

If you’re seeking experienced construction contractors in London and South East to carry out a school construction project, be sure to get in contact.

Other Projects

Ark Soane, Acton

We are delighted to be delivering this £52m design and build project for Countryside and the Department for Education. One of our largest construction projects in recent years, the Ark Soane project will see the construction of combined education and residential development in Acton. The Ark Soane mixed-use project will see the construction of; part […]

Read More

92 Leyton Green Road, Residential Construction

We are delivering the 92 Leyton Green residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one-bedroom, 16 two-bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of the Short Break respite […]

Read More

52 Whitmore Road (mixed use CLT)

As one of London’s commercial construction companies, we worked on the 52 Whitmore Road project, a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double-height photographer’s studio and three duplex flats with […]

Read More

Cannock Mill Cohousing Project

Our London building contractors worked on a unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the residential construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the […]

Read More

Respite Care Haydock Avenue, Healthcare Construction

Our construction company is delighted to have worked on this healthcare project where we completed a specially-designed respite facility for Ealing Council. The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. […]

Read More

The Palms Retail Space London, New Build Development

Our new-build developers worked on The Palms retail space, one of the new build developments, in the heart of Peckham, providing hairstyling and beauty services. As part of the ongoing redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in the Bleinheim Grove area to a […]

Read More

Hounslow Town Primary School, New Build Project

As a new build construction company, Hounslow Town Primary was one of our most prestigious education projects, the £20m new build school project has provided a new five-form entry primary school just off the High Street in Hounslow, within site of wider housing development. Our reinforced concrete framed, brick clad school building is part two […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two form to three form entry to provide capacity for over 630 children. Our London based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings […]

Read More

Park Primary School, Expansion Project

Our construction firm workedon the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof […]

Read More

St John’s and St James, New Homes Construction

We are pleased to be appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of new homes including a four-storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The […]

Read More

Macmillan Cancer Support Centre

Our company worked on the building construction project for Macmillan Cancer. The project comprised a complex part two/part three-storey structure built into the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in the reinforced cast- insitu waterproof concrete, with a partial reinforced concrete […]

Read More

David & Anne Street, Newham

We have been appointed to deliver the construction of affordable housing for the London Borough of Newham’s Wave 1 of infill sites identified for the affordable home programme 2018-2022. All of the projects are specified to be low energy homes a mixture of houses, flats and maisonettes designed to Passivhaus Standards. David Street The project […]

Read More