Wanstead High School and Leisure Centre, Wanstead

This £13.5m contract will see the construction of a new building serving both Wanstead Leisure Centre and Wanstead High School.

The London Borough of Redbridge appointed Jerram Falkus as main contractor on the East London scheme which will include a swimming pool and several improvements to the existing leisure estate.

The scope of work includes the creation of a 4,200 sqm three-storey building built over three blocks. Block B will consist of 14 new classrooms and associated facilities with a dining hall and commercial kitchen. Block C, the existing leisure centre, will be extended to include a 25m swimming pool, dance studios, a new reception area and changing rooms to suit the new facility. Refurbishment works to parts of the existing leisure centre will occur in Block D. These works will complement the new construction adjacent to the centre.

External works will also be undertaken to improve the appearance of the site and present an up-to-date facility.

The new and improved facilities will benefit both Wanstead High School and the local community.

The project has all the challenges that come with operating on a live school site. We have been working closely with the school and local community to ensure that our works are programmed in such a way as to minimise disruption. Above all, we are committed to keeping the public and our staff healthy and safe.

Practical completion is expected to be achieved by January 2026.

Other Projects

Hintze Hall Refurbishment, Natural History Museum, South Kensington

In bustling South Kensington,London, our team undertook one of the most prestigious projects to date – the renovation of the iconic ‘Hintze Hall’ at the Natural History Museum. For our London refurbishment contractors, this project was about preserving a piece of history while creating new spaces to house the ever-evolving exhibits of this world-renowned institution. […]

Read More

32 Cremer Street, Hoxton

As a construction company based in London, we were delighted to work on an exciting residential construction project just a short walk from our Shoreditch offices in which we also acted as the developer. Jerram Development’s project is situated on Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough […]

Read More

Ark Soane, Acton

This mixed-use project has seen the creation of a combined education and residential development in Acton, one of our largest construction projects in recent years. Educational Development LocatED Property Ltd, an arms-length body to the Department for Education, acted for the landowner and the Secretary of State for Education. Their role is to secure sites […]

Read More

Modular Construction Brochure

OUR Modular EXPERTISE Jerram Falkus’ modular and off site construction experience has broadened over the years and we are seeing an increase in demand to find new construction solutions. We have found modular construction to be a huge benefit to our public sector clients who are looking for less disruption, less waste and have education […]

Read More

Baldwin Terrace, Islington

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in […]

Read More

St Benedict’s School, New Ark, Ealing

Jerram Falkus takes immense pride in announcing the successful completion of the New Ark project at St Benedict’s School in Ealing. Following the triumph of prior construction endeavours for the school’s Sixth Form and Art Design & Technology Building, our appointment reaffirms our expertise in creating educational environments that inspire learning and growth.  Project Vision   […]

Read More

The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership. All foundations were piled due to poor quality of […]

Read More

St Clements, Corporation Street

Jerram Falkus are undertaking the design and construction of new homes for MHS Homes in Rochester. We will be delivering the construction of a reinforced concrete 5 and 6 storey building, with light gauge structural walls with an external skim brickwork façade with external winter gardens. The internal structure is concrete blockwork on the Ground […]

Read More

Haberdashers’ Aske’s Boys’ School, Elstree, Hertfordshire

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More

St John and St James Church, Tottenham

We are currently delivering a Grade II listed church refurbishment project and residential development on Great Cambridge Road, Tottenham, for the Christian Action Housing Association. The scheme will see the demolition of the existing church hall in St John and St James Church, followed by the construction of a single-storey extension to the building’s existing […]

Read More

Wesley House, Theological College, Cambridge

Our contractors worked on this education and heritage project including both refurbishment and new build work. Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. Our refurbishment and new build contractors worked on; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of […]

Read More

Park Primary School, Stratford

Our construction firm worked on the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a […]

Read More