Projects

Education Construction, University for Creative Arts

The design and construction of a new Film and Media education Centre at the University for Creative Arts campus in Farnham. Our new-build builders worked on this new building which has provided specialist facilities for film and media students.

The two-storey development is designed to house the technology and specialist equipment needed to prepare today’s creative students for industry. Construction took place on an occupied campus and provisions had to be put in place to minimise disruption to the daily activities of the University whilst maintaining safe pedestrian access around the site.

The development is designed to house the specialist facilities required by today’s film and media students to prepare them for industry including; Large lecture theatre (257 seats), Music technology facilities such as a recording studio, control room and dubbing theatre, Rehearsal and performance spaces, a high level of acoustic control, determined by the specialist functions of the rooms.

Looking for help with an education construction project? Look no further than Jerram Falkus. Our building contractors operate in both London and South East and we have a healthy portfolio of projects from refurbishment, new build developments, and more across a range of industries. Get in touch with us for more information.

Other Projects

Respite Care Haydock Avenue

We are delighted to have completed this specially-designed respite facility for Ealing Council.The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. Works consisted of the demolition of former garages and construction […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

The Palms Retail Space London, New Build Development

Our new-build developers worked on The Palms retail space, one of the new build developments, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to new build  purpose-designed […]

Read More

New Grandview, Oakwood Adult Autism Unit

As a residential construction company we worked on a great medical project. The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

Ranelagh Primary School

We have completed a new build two storey 600m2 extension and internal refurbishment works to the existing Victorian building at Ranelagh Primary School in Newham including; ground resurfacing and the repointing (brickwork). The new build extension provides a much needed new entrance and additional space for a nursery and staff resource areas, plus new studio […]

Read More

Residential Construction, The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality […]

Read More

London Construction Contractors – Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed construction contractors to expand from two form to three form entry to provide capacity for over 630 children. Our London based construction contractors constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings […]

Read More

St John’s and St James

We have been appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of a four storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The project also includes the […]

Read More

Residential Building Construction – Kingsbridge Terraces

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre.   All […]

Read More

Wivenhoe Road Modular Housing

Our second modular housing project for Barking and Dagenham will provide 20 new two-bedroom containerised homes. We prepared the groundworks ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping will start and we are set to complete the project within 30 weeks […]

Read More

Haberdashers’ Aske’s Boys’ School

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More