The Foundry, Refurbishment Project

This property refurbishment project involved the partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace.

The Grade II Listed former canal-side wharf building, The Foundry, is naturally cross-ventilated with an air source heat pump serves under-floor heating. A new independent steel frame on isolated pad foundations was constructed within the existing building to support the bowing Victorian solid stock brick canal-side elevation, which was then tied back to the existing brickwork, timber floor structures and exposed timber roof trusses.

The new steel frame allowed the ground floor to be cut back to form a double height atrium. Other property refurbishment works consisted of:

  • Breaking up basement floor slab and replacing with new super-insulated slab.
  • Partial retention of the original wall along Baldwin Terrace and extension in Metsec framing with facing brick and insulated render.
  • New Velfac high performance double glazed windows.
  • New ground and upper floor finishes, reusing exiting floor joist where possible & incorporating wet underfloor heating.
  • New exposed steel staircases at either end of building & new DDA platform lift.
  • Refurbishment & retention of existing roof trusses, new super-insulated roof build up including recovering in reclaimed Welsh slates.
  • Air source heat pump serving underfloor heating and radiant ceiling panels.
  • Photovoltaic panels generating part of the building’s electrical requirements.

Looking for refurbishment work? Contact us today. 

Other Projects

Putney High School, GDST

Our school construction company worked on the construction of a new 2000m2 building for Putney High School, part of the Girls’ Day Trust, to provide nine new science labs, a drama studio, a new music department and a forum to develop the practice and performance of the spoken word. The project also includes associated canteen […]

Read More

Hounslow Town Primary School, New Build Project

As a new build construction company, Hounslow Town Primary was one of our most prestigious education projects, the £20m new build school project has provided a new five-form entry primary school just off the High Street in Hounslow, within site of wider housing development. Our reinforced concrete framed, brick clad school building is part two […]

Read More

92 Leyton Green Road, Residential Construction

Our construction contractors are delivering the 92 Leyton Green residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one bedroom, 16 two bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of […]

Read More

Seven Islands Leisure Centre, Building Refurbishment

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The building refurbishment provides a new reception area and changing […]

Read More

Baldwin Terrace, Commercial Construction Project

As a commercial construction company, we worked on a partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in […]

Read More

University for Creative Arts, Education Construction

The design and construction of a new Film and Media education Centre at the University for Creative Arts campus in Farnham. Our construction team worked on this new education building which has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare […]

Read More

Cannock Mill Cohousing Project

Our London building contractors worked on a unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the residential construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the […]

Read More

Wivenhoe Road, Modular Housing Construction

Our company worked on our second modular housing construction project for Barking and Dagenham and will provide 20 new two-bedroom containerised homes. We prepared the groundworks ready for the delivery of the 20 two-bedroom modular homes from Premier Modular’s factory in East Yorkshire. Once installed, commissioning and landscaping took place and we completed the project […]

Read More

Wesley House, Theological College, Cambridge

Our contractors worked on this education and heritage project including both refurbishment and new build work. Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. Our refurbishment and new build contractors worked on; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of […]

Read More

New Grandview, Oakwood Adult Autism Unit

As a residential construction company we worked on a great medical project. The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, […]

Read More

Haberdashers’ Aske’s Boys’ School

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. Our company conducted the refurbishment in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and […]

Read More