Park Primary School, Expansion Project

Our construction firm workedon the school expansion, which was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new art room, along with a reorganisation of external play space. This will increase the school from a 2.5 form entry primary school to a full 3 form entry.

 

Occupying an extremely compact site overlooking West Ham Park, the scheme concentrates the expansion in two opposite areas of the school site in order to enhance the building and to provide a cohesive layout which works with the existing school. The building’s elevations, using terracotta tiles on an aluminium rainscreen system complement the existing building’s traditional Victorian masonry. The steel structural frame raises the accommodation off the ground to provide a new entrance and an undercroft play space.

 

Both extensions join the existing building with a light touch with glazed circulation spaces. The project also provides some remodelled areas within the existing school in the way of new toilets and enhanced fire lobbies.

 

Looking for a London or South East based construction firm? We are here. Contact us. 

Other Projects

University for Creative Arts, Education Construction

The design and construction of a new Film and Media education Centre at the University for Creative Arts campus in Farnham. Our construction team worked on this new education building which has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare […]

Read More

East End Thames View, Residential Construction

Our new build builders worked on the redevelopment of the eastern end of the Thames View Estate in Barking, providing 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works of our new build builders involved the […]

Read More

Macmillan Cancer Support Centre

Our company worked on the building construction project for Macmillan Cancer. The project comprised a complex part two/part three-storey structure built into the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in the reinforced cast- insitu waterproof concrete, with a partial reinforced concrete […]

Read More

Wesley House, Theological College, Cambridge

Our contractors worked on this education and heritage project including both refurbishment and new build work. Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. Our refurbishment and new build contractors worked on; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of […]

Read More

St John’s and St James, New Homes Construction

We are pleased to be appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of new homes including a four-storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The […]

Read More

Shetland Road, Bow

We are undertaking the £5.4m design and build contract for 19 new build low energy homes at Shetland Road, Bow in East London. The works will see the construction of two, 4 storey buildings and the improvement of open spaces, play area and hard landscaping on the former garages site. The new homes will provide […]

Read More

92 Leyton Green Road, Residential Construction

We are delivering the 92 Leyton Green residential scheme which will provide 47 new homes for Waltham Forest residents – 19 one-bedroom, 16 two-bedroom and 12 three-bedroom homes. Planning was approved by Waltham Forest Council’s Planning Committee in May 2020 for the development to be constructed on the former site of the Short Break respite […]

Read More

Cannock Mill Cohousing Project

Our London building contractors worked on a unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the residential construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the […]

Read More

Kingston House and Oman Avenue, Home Construction

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More

52 Whitmore Road (mixed use CLT)

As one of London’s commercial construction companies, we worked on the 52 Whitmore Road project, a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double-height photographer’s studio and three duplex flats with […]

Read More

David & Anne Street, Newham

We have been appointed to deliver the construction of affordable housing for the London Borough of Newham’s Wave 1 of infill sites identified for the affordable home programme 2018-2022. All of the projects are specified to be low energy homes a mixture of houses, flats and maisonettes designed to Passivhaus Standards. David Street The project […]

Read More

Haberdashers’ Aske’s Boys’ School

Our London construction contractors worked on the construction of Haberdashers’ Aske’s Boys’ School. The site is situated off Butterfly Lane, Elstree within the bounds of the School. The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close […]

Read More