Gloucester Avenue & Frontenac

Jerram Falkus Construction delivered two housing projects for Brent Council.

The design and build contract covered two new residential sites; Gloucester Close and Frontenac on Donnington Road. The two developments will provide a mixture of flats and houses in line with the borough’s current housing commitments;

  • Gloucester Close – 2 x two-bed houses and 3 x three-bed houses

The site was an existing green space/field in Stonebridge, Brent surrounded by residential back gardens with access off Stonebridge Park.

The north end of the site saw the delivery of two semi-detached houses. The south end of the site saw the delivery of a terrace of three houses.
In between the sets of new homes is a large area which has been left as a public open/wildlife space.

  • Frontenac – a four storey residential block (including 3 x three-bed and 1 x one-bed flats).

The block sits in the heart of a housing estate has been delivered on a highly constrained site.

 

Other Projects

The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership. All foundations were piled due to poor quality of […]

Read More

EKO Pathways School, Newham

We are a London-based construction company who completed and education construction project – the Eleanor Smith School, also known as EKO Pathways, located in the London Borough of Newham. This project was built to provide children and young people with social, emotional, and mental health difficulties with a state-of-the-art facility that caters to their unique […]

Read More

Weighbridge, Dagenham

Our first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of the enabling works […]

Read More

Wanstead High School and Leisure Centre, Wanstead

This £13.5m contract will see the construction of a new building serving both Wanstead Leisure Centre and Wanstead High School. The London Borough of Redbridge appointed Jerram Falkus as main contractor on the East London scheme which will include a swimming pool and several improvements to the existing leisure estate. The scope of work includes […]

Read More

Melfield Gardens, Lewisham: A Groundbreaking Low-Energy Development

Construction is currently underway at Melfield Gardens in Lewisham, a £12.5m design and build residential scheme commissioned by Phoenix Community Housing. As part of this project, we are responsible for the demolition of the existing building and the subsequent design and construction of 32 residential units and a community room. The development will consist of […]

Read More

The Palms Retail Space, Peckham

Our new-build developers worked on The Palms retail space, one of the new build developments, in the heart of Peckham, providing hairstyling and beauty services. As part of the ongoing redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in the Bleinheim Grove area to a […]

Read More

52 Whitmore Road, Shoreditch

As one of London’s commercial construction companies, we worked on the 52 Whitmore Road project, a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double-height photographer’s studio and three duplex flats with […]

Read More

309 Regent Street, University of Westminster

Jerram Falkus are undertaking refurbishment works on this Grade II Listed Building in the heart of the Capital. The site is the flagship building for the University of Westminster. Given the historic nature of the building and the prominent location, Jerram Falkus have been working closely with the Planning Officer at Westminster City Council. Located […]

Read More

Yotel, 100 Clerkenwell Road, The City, London

Jerram Falkus’ contractors in London worked on this hotel construction project. The project ‘Clerkenwell Road’ comprises 212 hotel guest rooms, front and back of house, retail shell, residential shell and work space. The hotel will be managed by the hotelier Yotel. Planning was for demolition of all existing structures onsite which was a former Petrol […]

Read More

285-289, Golders Green Road

Jerram Falkus recently started on site at our Golders Green Road scheme. The project consists of the construction of a six-storey block of 22 flats including basement car park. Enabling Works: This element of the works incorporated the construction of a crossover on Golders Green Road, the removal of live services, felling of trees and […]

Read More

Seven Islands Leisure Centre, Rotherhithe

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The building refurbishment provides a new reception area and changing […]

Read More

Shetland Road, Bow

We undertook the £5.4m design and build contract for 19 new build low energy homes at Shetland Road, Bow in East London. The works saw the construction of two, 4 storey buildings and the improvement of open spaces, play area and hard landscaping on the former garages site. The new homes provide a mixture of; […]

Read More