St John and St James Church, Tottenham

We are currently delivering a Grade II listed church refurbishment project and residential development on Great Cambridge Road, Tottenham, for the Christian Action Housing Association.

The scheme will see the demolition of the existing church hall in St John and St James Church, followed by the construction of a single-storey extension to the building’s existing front entrance, as well as re-modelling and alteration of this area and refurbishment of the church interior. This will include mechanical and electrical services, external works and below ground drainage.

To allow church services to continue while the works are in progress, a 32ft long temporary and mobile church with disability access has been installed adjacent to Jerram Falkus’ site office.

The project will also involve the construction of a four-storey block which will provide 21 new homes comprised of 18 flats, 2 x three-bedroom houses and 1 x four-bedroom houses, as well as a community facility and a new vicarage.

The new residential block has had solar panels as well as a sedum green roof installed for greater sustainability benefits.

The scheme is due to reach practical completion in August 2022.

Get in touch today if you want an established construction company to help with your residential or heritage project.

Other Projects

309 Regent Street, University of Westminster

Jerram Falkus are undertaking refurbishment works on this Grade II Listed Building in the heart of the Capital. The site is the flagship building for the University of Westminster. Given the historic nature of the building and the prominent location, Jerram Falkus have been working closely with the Planning Officer at Westminster City Council. Located […]

Read More

Seven Islands Leisure Centre, Rotherhithe

The revitalisation of this leisure centre has undergone a £1 million building refurbishment and has now been officially opened. Pick Everard provided mechanical and electrical building services design to assist the local authority in reducing running costs and bringing back to life a dated building. The building refurbishment provides a new reception area and changing […]

Read More

Kingston House and Oman Avenue, Brent

Our home construction team worked on two housing schemes with Brent Housing Partnership for Brent Council which will include the construction of nine homes across two infill sites. Kingston House- £868k The project includes the demolition works to the existing garages sites followed by the design and construction of two single-storey detached bungalows (1x 3 […]

Read More

The Pump House, Walthamstow

The residential construction project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership. All foundations were piled due to poor quality of […]

Read More

Great Ormond Street Hospital, Bloomsbury

Jerram Falkus completed the refurbishment and conversion of a pair of adjoining Grade II listed Georgian townhouses for Great Ormond Street Hospital Charity at Powis Place, London. The works included a new build single-storey rear extension at ground level, refurbishment throughout and redecoration works to the external envelope. The conversion saw a change of use […]

Read More

Weighbridge, Dagenham

Our first modular housing construction project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Our new-build developers completed all of the enabling works […]

Read More

Kingsbridge Terraces, Barking

The building construction of the new Kingsbridge Terraces residential development. The development consists of 27 new maisonettes and houses, with associated car and cycle parking and open spaces. This scheme forms part of the wider regeneration of the 1960’s Gascoigne Estate in Barking and is only a short walk from Barking town centre. All of […]

Read More

St Benedict’s School, New Ark, Ealing

Jerram Falkus takes immense pride in announcing the successful completion of the New Ark project at St Benedict’s School in Ealing. Following the triumph of prior construction endeavours for the school’s Sixth Form and Art Design & Technology Building, our appointment reaffirms our expertise in creating educational environments that inspire learning and growth.  Project Vision   […]

Read More

East End Thames View, Barking

Our new build builders worked on the redevelopment of the eastern end of the Thames View Estate in Barking, providing 276 high quality affordable homes. The development was achieved without grant-funding or cross-subsidy and made possible via a private investment model designed to enable social regeneration. The works of our new build builders involved the […]

Read More

Landseer Avenue, Manor Park

We are delivering a new build residential development in East London on Landseer Avenue, Manor Park, for the London Borough of Newham. The scheme will produce low energy homes designed to the Passivhaus Standard. The project work will see the demolition of disused garages, followed by the construction of four residential blocks comprising 11 homes […]

Read More

Melfield Gardens, Lewisham: A Groundbreaking Low-Energy Development

Construction is currently underway at Melfield Gardens in Lewisham, a £12.5m design and build residential scheme commissioned by Phoenix Community Housing. As part of this project, we are responsible for the demolition of the existing building and the subsequent design and construction of 32 residential units and a community room. The development will consist of […]

Read More

Wesley House, Theological College, Cambridge

Our contractors worked on this education and heritage project including both refurbishment and new build work. Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. Our refurbishment and new build contractors worked on; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of […]

Read More