Kingston House and Oman Avenue, Brent

Two housing schemes with Brent Housing Partnership for Brent Council which will provide nine homes across two infill sites.

Kingston House- £868k
The project includes the demolition works to the existing garages sites followed by the design and construction of two single storey detached bungalows (1x 3 bed and 1x 1 bed)

Oman Avenue – £1.85m
The design and construction of four single storey detached bungalows (4x 2 bed) and a 3 storey block of flats (3 x 2 bed) to Oman Avenue. Both projects will include associated external works including car parking, cycle storage, refuse storage, amenity space and landscaping. All units will be provided for affordable rent.

Other Projects

Baldwin Terrace

The partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus […]

Read More

St John’s and St James

We have been appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of a four storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The project also includes the […]

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete frame […]

Read More

Park Primary School

The school expansion was carried out in three phases. The first phase provides four new classrooms and a new main entrance. Phase 2 remodelled existing classrooms into WC accommodation and phase 3 adds a new multi-purpose hall, raised on angled stilts, creating a mini MUGA court underneath and a roof terrace focused around a new […]

Read More

Haberdashers’ Aske’s Boys’ School

The site is situated off Butterfly Lane, Elstree within the bounds of Haberdashers’ Aske’s Boys’ School The site posed logistical challenges due to its woodland location nearly 1 kilometre from the  school entrance, across school playing fields and unmade tracks. It was also extremely close to Elstree Aerodrome which required special approvals of our procedures […]

Read More

New Grandview, Oakwood Adult Autism Unit

The New Grandview Oakwood Adult Autism Unit provides long term specialist residential accommodation to adults with autistic spectrum disorder, who require 24-hour support. The building features three self-contained apartments, for those who can live more independently, as well as en-suite bedrooms, communal areas, and gardens, all specifically designed for people with autism and mental health […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed to expand from two form to three form entry to provide capacity for over 630 children. We constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two new classrooms, three […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More

Peckham Palms, Hair and Beauty Hub

The Palms is a retail space, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to a new build purpose designed facility on the site of former disused […]

Read More

Ranelagh Primary School

A new build two storey 600m2 extension and internal refurbishment works at an existing primary school in Newham. The new extension, designed by Rivington Street Studio Architects, provides much needed new entrance and additional space for a nursery and staff resource areas plus new studio area at 1st floor level.

Read More