Sebastian Court

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus to undertake the demolition of the original Sebastian Court buildings, and enabling works in preparation of the a new high-quality affordable housing development on the site.

Jerram Falkus completed the demolition and commenced piling for the new residential blocks and began constructing the new substation which has unlocked the site in preparation for a new high-quality affordable housing development.

The new Sebastian Court housing development will provide over 90 affordable and quality homes for local people, an increase of almost 30 units when compared to the original building that has now been demolished.

This development forms part of Barking and Dagenham’s commitment to deliver thousands of new affordable homes for local people.

To follow monthly project progress via our dedicated project landing page, click here : Sebastian Court

 

Other Projects

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Latymer Upper School Sports Facility

Works comprised the construction of a new three-storey sports centre extension to the existing facility which provided a new 25 metre 6 lane swimming pool with automated moving floor, dance and fitness studios, wet and dry changing facilities, WC’s, stores and offices. Piled foundations and waterproof reinforced concrete basement and swimming pool, reinforced concrete frame […]

Read More

Pound Lane, Basildon

The works comprise all necessary demolition and the design and construction of 9 new affordable homes, including; seven one and two-bed apartments and two and two-bed houses complete with associated drainage and services alterations, all infrastructure, external hard and soft landscaping. As part of its shared ownership new homes delivery programme, Sempra is working in […]

Read More

Hintze Hall, Natural History Museum

One of our most prestigious projects, the Natural History Museum’s ‘Hintze Hall’ project included the refurbishment and restoration of the Grade I listed central space, creating additional gallery spaces at ground, first and second floor levels. The works comprised replacement of roof lights and conservation of the building’s listed fabric which acts as the gateway […]

Read More

Wesley House, Cambridge

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

52 Whitmore Road (mixed use CLT)

52 Whitmore Road is a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double height photographer’s studio and three duplex flats with roof terraces. The Cross Laminated Timber (CLT) structure was completed […]

Read More

Baldwin Terrace

The partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus […]

Read More

University for Creative Arts, Farnham

The design and construction of a new Film and Media Centre at the University for Creative Arts campus in Farnham. The new building has provided specialist facilities for film and media students. The two-storey development is designed to house the technology and specialist equipment needed to prepare today’s creative students for industry. Construction took place […]

Read More

The Pump House, Walthamstow

The project consisted of the design and build of 21 new social housing units comprising 11 flats over two three-storey blocks, and 10 houses in two terraces. Tenure mix was 12 units affordable rent (including two wheelchair accessible units) and 9 units shared ownership.   All foundations were piled due to poor quality of made […]

Read More

EKO Pathways/Eleanor Smith School

Eleanor Smith School (EKO pathways) is a special educational needs school based across two sites in the London Borough of Newham. This new build site provides the School with a brand-new facility constructed on a brownfield site in East Ham. The new Eleanor Smith School site caters for children and young people with social, emotional […]

Read More

Weighbridge Modular Housing

Our first modular housing project in Dagenham provides 92 new homes which have all been prefabricated off-site using top quality materials and methods before being delivered to the site Cook Road, Dagenham. The development consists of 24 one-bedroom flats, 36 two-bedroom flats and 32-three-bedroom homes. Jerram Falkus completed all of the enabling works and infrastructure […]

Read More

St John’s and St James

We have been appointed to undertake the demolition of an existing church hall on Great Cambridge Road, Tottenham and the construction of a four storey block which will provide; a community facility, 18 flats, two x 3 bedroom houses, one x 4 bedroom house, in addition to a new vicarage. The project also includes the […]

Read More