Putney High School, GDST

The construction of a new 2000m2 building for Putney High School, part of the Girls’ Day Trust, to provide nine new science labs, a drama studio, a new music department and a forum to develop the practice and performance of the spoken word. The project also includes associated canteen refurbishment and external works.

The building will replace the former timber framed, brick and glass clad science block that was built in the early 1970s increasing the amount of teaching space and also offering more focused and flexible learning environments for the students.

Constructed mainly of London brick and inspired by classical proportions, the building will feature copper clad strips alongside the main windows. The south-facing facade at the heart of the site has a colonnade that provides solar shading to minimise heat gains and glare and maximise daylight in the teaching spaces, all aspects that have a crucial impact on learning.

Other Projects

Peckham Palms, Hair and Beauty Hub

The Palms is a retail space, in the heart of Peckham, providing hairstyling and beauty services. As part of on-going redevelopment of the Peckham Rye Station area, Southwark Council relocated the many hair and beauty businesses originally based in Bleinheim Grove area to a new build purpose designed facility on the site of former disused […]

Read More

Wesley House, Cambridge

Wesley House is a post-graduate theological college, housed in 1920s Grade II listed neo-Tudor buildings. The construction works included; new Academic and Gatehouse block, new three storey accommodation block with 15 en-suite rooms, remodelling of existing 1920’s Grade II listed buildings to provide 13 en-suite student rooms with access to shared kitchen facilities, staff accommodation […]

Read More

Cannock Mill Cohousing

A unique Passivhaus Cohousing project in Colchester, Essex for Cannock Mill Cohousing Colchester (CMCC). The works included the construction of 23 new build homes, a mixture of one and two bed flats and 17 houses with up to three bedrooms with garages and useful storage space in the under croft of the six flats. The […]

Read More

Baldwin Terrace

The partnership with the architectural practice Cullinan Studio to refurbish half their building for a new low energy workplace and demolish the other half acquired by Jerram Developments to build 12-two bed apartments in Baldwin Terrace. The construction of the 12 apartments situated along Regent’s Canal in Islington, comprised a 1,160m2 five storey development plus […]

Read More

The Anning Rooms, Natural History Museum

An exclusive suite of rooms available for use by Members’ and Patrons’ Room as part of the Natural History Museum’s new membership strategy. The project took place in the Grade I listed Waterhouse Building on the central axis of the Natural History Museum’s primary frontage, with works to the towers on the 2nd and 3rd […]

Read More

Sebastian Court

Barking and Dagenham’s regeneration company, Be First, appointed Jerram Falkus to undertake the demolition of the original Sebastian Court buildings, and enabling works in preparation of the a new high-quality affordable housing development on the site. Jerram Falkus completed the demolition and commenced piling for the new residential blocks and began constructing the new substation […]

Read More

52 Whitmore Road (mixed use CLT)

52 Whitmore Road is a 6 storey mixed use development on the south bank of the Regent’s Canal in Hackney. The site, which formerly housed a warehouse, comprises of offices funded by the Shoreditch Trust, a double height photographer’s studio and three duplex flats with roof terraces. The Cross Laminated Timber (CLT) structure was completed […]

Read More

Macmillan Cancer Support Centre

The project comprises a complex part two/part three storey structure built in to the slope of Bristol Gate at the Royal Sussex County Hospital. The retaining walls and lower ground floor slab are constructed in reinforced cast- insitu waterproof concrete, with a partial reinforced concrete frame and upper floors and a hybrid superstructure frame of […]

Read More

Respite Care Haydock Avenue

We are delighted to have completed this specially-designed respite facility for Ealing Council.The works included the construction of a new respite facility on the grounds of a former garages site in Haydock Avenue. The site was particularly restricted to operate within and access with deliveries. Works consisted of the demolition of former garages and construction […]

Read More

Hounslow Town Primary

One of our most prestigious education projects, the £20m new build school project has provided a new five form entry primary school just off the High Street in Hounslow, within site of wider housing development. This reinforced concrete framed, brick clad school building is part two and part three storey. The works comprised the contruction […]

Read More

Geffrye Place, Hoxton

The Jerram Development’s project is situated Cremer Street adjacent to the Museum of the home in Hoxton in the London Borough of Hackney. The scheme comprised both the refurbishment of the former Marquis of Lansdown public house and a new four storey building adjacent. The existing public house listed building has been stabilised, retained and […]

Read More

Tollgate Primary School

As part of the London Borough of Newham’s expansion programme, Tollgate Primary School needed to expand from two form to three form entry to provide capacity for over 630 children. We constructed two new two-storey classroom blocks in order to extend the existing school buildings and these new buildings now accommodate two new classrooms, three […]

Read More